Our Projects

Santo
Resort
- Hvar Island

Luxury in harmony with nature |
A legacy for generations

Santo Resort is an exclusive 5-star mixed-use resort on the Croatian island of Hvar. A unique retreat is being created on a coastal site spanning approximately 560,000 m², featuring unobstructed sea views, a private sheltered bay, and excellent infrastructure.

The Development Concept

Luxury Villas & Exclusive Residences: Highest standards and maximum privacy.

High-End 5-Star Hotel: World-class service and premium amenities.

Private Marina: Berths for up to 50 yachts.

Customizable Design: Resort concept fully adaptable to investor preferences.

Highlights & Unique Selling Points

Absolute Privacy: Untouched nature with no future neighboring developments (neither to the left nor the right of the property).

Stunning Location: Private beaches and unobstructed views of the Adriatic Sea.

Rare Opportunity: A unique large-scale project on one of the Mediterranean's most sought-after islands.

Status & Investment Framework

Planning Status: Zoning plan (urban planning) and infrastructure building permits are already in place.

Estimated Total Investment: Approx. €270 million for the realization of a premier luxury resort.

High Value Potential: Excellent return opportunities through long-term rentals and the selective sale of individual units.

For further information, please contact us via email at:

info@nizimo.com

or

Tel.: +49 152 045 95 130

Bel Air
Resort

BEL AIR RESORT – Your investment in an exclusive luxury and health destination

The Bel Air Resort is being developed in the immediate vicinity of Dubrovnik at an altitude of 600 meters above sea level. It combines a unique microclimate—blending continental and Mediterranean air—with breathtaking panoramic views of the Adriatic Sea and the surrounding islands. The resort integrates luxury real estate, premium hospitality, and comprehensive wellness and health facilities, creating a destination that is attractive year-round.

Project Key Data

Total investment: €250 – €295 million

Projected value upon completion: €650 – €700 million

Total area (gross): approx. 70,300 m² on a site of approx. 540,000 m²

Planned facilities & areas

Luxury villas (112 units): 33,300 m²

Premium apartments (88 units): 10,800 m²

VIP residences (2 exclusive units): 2,200 m²

Hotel (120 rooms): 18,000 m²

Dining & gastronomy: 4,000 m²

Highlights: Open-air amphitheater with 6,000 seats for concerts and events, wellness & spa center, medical rehabilitation center, heliport, and sports & leisure facilities.

Key advantages

Year-round potential: Ideal for health tourism, wellness, and athlete training thanks to outstanding air quality and a unique climate.

Sustainable concept: ESG-compliant construction and a sustainable energy concept.

Exclusivity & privacy: Fully enclosed site with no possibility of adjacent development. 

For further information, please feel free to contact us via email at:

info@nizimo.com

or

Tel.: +49 152 045 95 130

Mining projects

​Raw Material & Mining Projects
Energy for the Future

We offer first-class mining and raw material projects for sale and for strategic partnerships. Our partner companies hold all necessary permits, concessions, and authorizations for the respective project phases.

COLLABORATION OPPORTUNITIES

We are open to various forms of cooperation:

Full acquisition (sale of projects)

Entry of a strategic partner

Joint venture / exploration and operating companies

OVERVIEW OF OUR PROJECTS

1. Bauxite Mines

Area: approx. 150 km² (2 mining projects, 38 proven deposits)

Deposits: 5–8 million tonnes of white and red bauxite (according to the Tuzla Mining Institute)

Estimated reserve value: > 5 billion EUR

Investment required: approx. 7.5 million EUR (for extraction, processing, studies & business plans)

2. Silicon (Quartzite) Mine

Area: approx. 100 km²

Special feature: Geological studies indicate additional gold mineralization

Estimated reserve value: > 20 billion EUR

Investment required: approx. 7.5 million EUR (start of production)

3. Manganese Mine

Area: approx. 120 km²

Deposits: approx. 20 million tonnes of ore (manganese content: 35% to 75% Mn)

Status: Concession & permits in place; modernization/reconstruction

Investment required: approx. 5 million EUR (incl. equipment & machinery)

4. Gold Mine

Area: approx. 65 km²

Deposits: Gold, as well as barite, zinc, lead, and silver

Estimated resource value: > €10 billion

Investment required: approx. €12–15 million (equipment & processing facilities)

5. Gold, Zinc, Lead & Silver Mine

Area: approx. 120 km²

Estimated reserve value: > €20 billion

Advantage: Near-surface mineralization resulting in lower extraction costs. Considered one of the region's most promising deposits.

6. Silicon Mine (High-Purity)

Area: approx. 42 km²

Deposits: High-purity silicon (up to 99.99% SiO₂) for glass, electronics & solar technology

Estimated annual value: approx. €9 million

Investment required: approx. €6 million

7. Magnesite Mine

Area: approx. 38 km²

Application: High-quality magnesite for the pharmaceutical, chemical, and metallurgical industries

Investment required: approx. €3 million (start of production)

ADDITIONAL DEVELOPMENT PROJECTS

In addition, other raw material projects are currently in the development phase and could be included should higher capital requirements arise:

Pyrophyllite

Barite

Basalt

For further information, please feel free to contact us via email at:

info@nizimo.com

or

Tel.: +49 152 045 95 130

Information icon

Wir benötigen Ihre Zustimmung zum Laden der Übersetzungen

Wir nutzen einen Drittanbieter-Service, um den Inhalt der Website zu übersetzen, der möglicherweise Daten über Ihre Aktivitäten sammelt. Bitte überprüfen Sie die Details in der Datenschutzerklärung und akzeptieren Sie den Dienst, um die Übersetzungen zu sehen.